Tag Archives: Hearthstone Lodge

Designing a Community

Some town centres grow organically as the population grows. Whistler was not one of those towns. Instead, Whistler was carefully planned to ensure the growth of a vibrant, happy and healthy community. If you have recently been enjoying some of the few moments of spring sun on one of Whistler’s many patios, you can thank Eldon Beck, the early council, and Whistler’s planning and project management team.

Early sketches of Whistler Village show how sunlight, views and wind direction were accounted during the planning.

The first resort municipality in BC formed in 1975, the Resort Municipality of Whistler (RMOW) was an experiment that gave the RMOW far more control of the land, development and community than was typical for a municipality. When Phase 1 of the Town Centre went to development bid in 1978, the 12 parcels had strict covenants for use and planning restrictions attached. It was also divided into small parcels to ensure that local owner-developers could buy land parcels, keeping it in the community and ensuring that one large conglomerate would not and could not buy the whole village.

A community is not complete without local people, and much research went into how best to encourage residents and visitors alike into the Village and make sure the centre of town was full of life. According to Jim Moodie, from the project management team of Sutcliffe, Griggs and Moodie, who were tasked with preparing the development plan for the Town Centre, “We didn’t want a whole strip of T-shirt shops”. The location of the grocery store, drug store, hardware store and liquor store were carefully placed to ensure local residents had a purpose for going into the Village. They can still be found in their original location. Additionally, Tapley’s Pub opened in it’s current location in January 1981. As the first pub in the Town Centre, it was important to open Tapley’s Pub early in the development process to ensure that the construction workers had somewhere to go that would encourage them to stay in the Village during their leisure time.

Tapley’s Pub in May 1980 as the roof is going on. Still the early days of Whistler Village with very few buildings. Whistler Question Collection.

To further ensure there would be enough people to support the businesses, mixed-use rental and residential housing was required to be built over most of the commercial premises. In planning, building height and roof angle were specified to maximise the natural sunlight, and patio locations were carefully laid out. Unsurprisingly, this level of control and direction was not popular with some developers who, throughout the construction of all phases of the Village, tried to be the exception – offering more money to get an exemption from building residential rooms, underground parking, or to keep their outdoor patio closed. However the covenants for each build were clearly and carefully laid out from the beginning, leaving little room for interpretation, and each completed stage of Whistler Village is very similar to the final plans, even down to how people walk through the Village stroll.

When Eldon Beck designed the Village it was to feel connected to nature, with the stroll set out to create a natural flow of people, encouraging people to slow down and spend time with one another. Similar to a meandering river, where the Village stroll gets wider you often see people slow down and gather as they stop to talk to friends or take in their surroundings, exactly as the planners hoped.

Whistler Village under construction, November 1979. The copper beams of Tapley’s Pub can be seen in the middle left.  Hearthstone Lodge and Blackcomb Lodge are also under construction. The first completed building in the Village was the Public Service Building top right, and the old Myrtle Philip School is on the top left. During the construction of the Village the near-constant noise of the pile driver could be heard in White Gold. Whistler Question Collection.

As Whistler ticked into the 1980s the Village was coming along nicely with the development of Phase 1 well underway, however, there were economic clouds on the horizon. Soon the Canadian economy would tank, sky rocketing interest rates over 20% and temporarily halting the formerly-booming development, creating new challenges for the fledgling Whistler Village.

This Week In Photos: June 14

This week in June has hosted a variety of events, including high school graduations, construction of summer attractions (and the Village), bicycle rodeos and picket lines.

1978

The Valleau Logging Camp Cookhouse near Mons Station stands deserted but not for long. Local residents plan to renovate the building and operate a food service for the valley this summer.

Pemberton Secondary Class of 1978. Not in order, the students are: Sherry Bilenduke, Hugh Blackstock, Kim Blundell, Helen Bush, Pat Bush, Lois Carson, Gary Decker, David Fairhurst, Carol Gilmore, Ken Gilmore, Laurie Hamula, Cathy Heine, Polly Jang, James Kernaghan, Norman LeBlanc, Anita Lever, Spencer Lowenberg, Edward Mah, Carola Marinus, Selma Miller, Bert Perkins, Ann Peterson, Doris Rollert, Kelly Ross, Philip Tourand, Conroy van der Lee, Peter Vogler, Celeste Watson, Michael Wetti, Michael Wilson, Joanne Wood.

The graduating students from the Garibaldi/Whistler area with their parents at the Pemberton Secondary Graduation on Friday.

Whistler students from Myrtle Philip School participated in a district-wide track meet held in Squamish.

1980

Whistler Land Company’s new office is barely occupied last week as the first town centre offices are occupied.

Work on the golf course as seen from the bluffs where the building lots are situated.

Sandra Pollock and Kathy Francis prepare the models and… KABOOM!…..

Attorney-General Alan Williams, MLA for West Vancouver-Howe Sound, discusses the Barrier report and the BC Government’s Order in Council that froze all land in Garibaldi with area residents.

Lift Co. employee seeds lower northside runs to help cut down erosion. Runs are almost completed at lower elevations.

All that remains of a ’77 Ford pickup after it left the road early Saturday morning.

1981

The first glulam being hoisted into place over the swimming pool area of the Resort Centre.

Al Raine (left) takes publishers from around the province on a tour of Whistler Town Centre.

Betty Chaba strums a tune while relaxing at Alta Lake in front of JB’s.

Garibaldi Building Supplies’ expanded new yard is ready for a busy summer season.

Some members of the Whistler Rotary Club.

1983

The most prudent bikers in the RCMP bicycle rodeo held Saturday, June 12 in Village Square (l to r) Simon Bellar, Samantha O’Keefe, Jody Rustad, Nicolas Busdon (overall winner). Melanie Busdon, Dave Den Duyf and Davey Blacklock who won the bicycle donated by Whistler Chamber of Commerce.

Municipal trail crews cut through the brush to make the final connection between the Alpine Meadows trail and the Meadow Park trail (under construction). Paving to complete the trail system will begin at the end of July.

These three answered this week’s question: Graeme Mounsey, Traveller, Sydney, Australia; Walter Therrien, Caretaker – Capilano Mobile Park, North Vancouver; Anne Crocker, Travel Counsellor – North Van Chamber of Commerce, West Vancouver.

If you attend the Sea Festival parade July 23, you’ll be able to enjoy the final results of this artist’s rendering for a Whistler float. The illustration will be used as a guide for constructing the float, estimated to cost $2,500.

1984

Kids, cars and parents turned out Saturday for a car wash and bake sale that netted over $200 for the school’s parent/teacher group. Police cars, a fire truck and a whole flotilla of private vehicles stopped for spring cleaning.

Emergency Services (last year called Tri-Services) overcame a mid-game spurt by the team from Citta to post a 17-12 victory on Monday in Whistler Beer League slo-pitch softball league action. Emergency Services now has a sparkling record of three wins and no losses.

Three (two pictured) locked-out truckers picketed The Grocery Store in the village Tuesday, preventing other union members from bringing supplies to the store. Picketing trucker Dayton MacKenzie said they are protesting their employer’s decision to use “scab” drivers for food deliveries. Employer Slade and Steward Ltd. has locked out Vancouver employees, and other employees in BC are on strike as of Tuesday. Grocery Store owner Geoff Power was unavailable for comment at press time.

An Alpine Paving crew was hard at work last Wednesday paving the mini golf course just behind L’Apres at the gondola. Whistler Mountain hopes to have the Tattersfield and Associates designed course ready for operation by Saturday, June 16, but promise to have it ready for play by the following weekend. Eighteen holes will cost players $2.

No one skis anymore at the former Rainbow Ski area just off Highway 99 between Alpine Meadows and Emerald Estates but at one time it was the only place in Whistler open for night skiing. The ski jump was built by volunteers in the mid-1970s (though the date was recorded as mid-1970s in the Question accounts told to the Whistler Museum put the building of the ski jump earlier in the 1960s; the last competitions held on the ski jump occurred in the mid-1970s.).