Tag Archives: new year

Poop or Chaos? A Whistler Sewer Story

As we have recently learnt at the Whistler Museum, maintenance problems can pop up at the most inconvenient times and create quite the disruption. The same was true when a truck came down on power lines in Whistler one New Year’s Eve.

Disposing of human waste was an ongoing challenge for residents of Alta Lake and Whistler until the wastewater treatment plant opened in 1977. Prior to the sewer system, residents had private septic systems or outhouses, which posed environmental and practical problems for the growing community. On the weekends Brian Leighton, who lived in Creekside, regularly had to knock on the door of the upstairs units asking if they would hold off from flushing the toilets, as the septic system would back up through his toilet when all the units were full.

According to Garibaldi’s Whistler News, in 1977 Whistler had a permanent population of 800, but this swelled to nearly 7000 during the peak season and a reliable sewer system was required before the town could grow further. The importance of the sewer was not understated by Mayor Pat Carleton during the grand opening of the wastewater treatment plant, which included lunch, tours and much fanfare, when he said, “The foundation of Whistler’s future is this plant and sewer system.”

The sewer system was an important step before construction of Whistler Village could begin. Garibaldi’s Whistler News.

Despite initially being built to accommodate a growing community, the wastewater treatment plant could not keep up with the rapid and relentless increase in the population. Cliff Jennings was originally in charge of water distribution and sewer collection for the Resort Municipality of Whistler (RMOW) before becoming the superintendent of the wastewater plant. According to Cliff, every two years the wastewater treatment plant was having an expansion. However, with the economy slowing in 1981 there was no money to improve the plant coming from the Provincial or Federal Governments despite the population increasing. “We were pretty much always three years behind until just very, very recently. It was always just [cross your fingers].”

Continual construction of the plant during this time had its own challenges. Timing had to be perfect because it could only be powered down for short periods, around 90 minutes, before the waste had to be diverted, which meant raw sewage would be pumped directly into the river. “We never had to purposely divert but we got awfully close,” said Cliff.

Mayor Pat Carleton hands Cliff Jennings the keys to the municipal truck, August 13, 1978. Whistler Question Collection.

On the fateful New Year’s Eve, the power company had been working on the lines at the intersection of Highway 99 and Nesters when the hydraulic lift broke, landing the lift on the power lines. To get the lift off and the lines restored the power would have to be turned off to the entire Valley while it was fixed. This included the Village, which relied on floodlights as the main security measure on New Year’s Eve. Bringing down the lights would have meant total chaos in the busy Village, and would be questionable for safety. However, without turning the entire power grid off the line could not be fixed, and power to Whistler Cay and Nesters would be off all night until BC Hydro could fix the truck on the line. That would mean that the wastewater plant for these areas would also have no power for far longer than the 90 minutes, and without power, diversion of wastewater into the environment.

Due to safety concerns in the Village, the decision was made to keep the power off to Whistler Cay and Nesters for the night, rather than turn all the power off to the entire Valley to fix the line. Thankfully Cliff Jennings and the wastewater team were instead able to keep the treatment plant going with a diesel generator. The lucky team got to ring in the New Year’s with the sewage in the dark, but kept it going long enough that the lines could be fixed without any diversion, while revellers could continue as normal in the Village.

Revellers setting off fireworks on New Year’s Eve in Whistler Village, 1985. The Village was still busy but there were fewer security measures in place. Whistler Question Collection.

This Week in Photos

As it’s the beginning of a new year, we thought we’d share some photos from the beginnings of some other years in Whistler’s past.  From the mundane to the more historic, we’ve collected a few shots of six new years in Whistler.  All photos come from the Whistler Question and were taken or published in the first week of January.

1979

Cold temperatures created perfect temperatures for outdoor skating.  Here we have a hockey game on quite an impressive looking rink.

Creekside was a pretty busy place with cars taking up most of the available space during the days.

Rocky the Raccoon pays his nightly visit through the hole in the rock at the Whistler Vale bar.

One for the road! Highways’ gravel truck being rescued out of the ditch by Wayside Park on Sunday, January 7.

1980

Bill and Lillian Vander Zalm engaging in a friendly snowball fight during their visit to Whistler.

A busy moment at the intersection in Creekside with the ski traffic filling the highway.

The snow was looking pretty good for the new year!

Whistler children enjoy a performance by Officer O’Sneely and giants in the Myrtle Philip School gym.

1981

Highway 99 shows the effects of rampant flooding. Turbulent waters carved a new creek bed for a hundred yards.

One of two destroyed power lines when flood waters washed out footings south of the Tisdale Hydro Station.

BCR Rutherford Creek crossing hangs by its rails after the December 26 flood washed away all supports and girders.

Pauline Wiebe hard at work checking the next edition of the Whistler Question.

1982

Willie Whistler poses with some young racers at the base of the village lifts.

They’re off! One of the groups starts in the ALSC X-Country race January 2.

The shelves at the grocery store were looking pretty empty after the holidays.

Two real longhorns – assistant manager Gavin Yee poses with manager Peter Grant.

Ski ballet made an appearance on the slopes with some impressive acrobatic feats.

1983

Sign bylaw is in, neon goes out. A municipal bylaw saw the end of neon signs in the Village.

A pensive Dave Murray checks out the application of new skiing techniques put to task by young members of the Whistler Mountain Ski Club during the recent training camps.

Ready! Get Set! Go! The newest members of Alta Lake Sports Club are off and racing in a 400 metre cross-country event Sunday, January 2.

A Molson downhill race was held on Whistler Mountain, making the most of the snow.

Heavy apres ski traffic is masterfully channelled by parking attendant Nick Di Lalla on Sunday, January 2, in Whistler Village.

1985

New Year’s Eve saw a packed Village as crowds celebrated the countdown to 1985.

The celebrations for New Year’s Eve were overseen by Santa Claus, hanging around a bit later than expected.

The offices of the Whistler Question, where Kevin Griffin works tirelessly on despite interruptions.

The Whistler Singers perform under the direction of Molly Boyd.

And her son, Rob Boyd, walks down some stairs in the Whistler Village.