Whistler Museum and Archives Society Museum Musings,Profiles,Ski-Town Stories Gerhard Mueller: Designer of Whistler’s First Lifts

Gerhard Mueller: Designer of Whistler’s First Lifts

0 Comments

With the wet weather, frigid temperatures and winds that have come in the last two months, many of us out on the mountains have appreciated the temporary respite offered by the enclosed gondolas.  To show our appreciation, we’re offering some information on the man who designed the first lifts installed on Whistler Mountain, including the original four-person gondola.

Skiers load the original four-person gondola at the base of Whistler Mountain in the late 1960s.
Skiers load the original gondola at the base of Whistler Mountain in the late 1960s.

Gerhard Mueller was an early pioneer in the ski lift industry.  In the late 1920s, as mountain resorts in the Alps were still beginning to redefine themselves as winter resorts, Mueller was a 17-year-old mechanical engineering student who had grown tired of having to continuously climb up the slope in order to practice his skiing on the way down.

To address this issue Mueller built his (and Switzerland’s) first ski tow at St. Moritz using 1″ hemp rope and the engine from an old motorcycle.  This first rope tow was patented in 1932 and was later improved to address complaints of tired hands and arms.

After the end of World War II Mueller founded his own company, GMD Mueller, in 1947 and continued to design innovative lift systems, including the modern detachable chairlift.

A page from a 1965 GMD Mueller catalogue. Photo: chairlift.org/mueller.html
A page from a 1965 GMD Mueller catalogue. Photo: chairlift.org/mueller.html

In their 1965 catalogue GMD Mueller advertised their ski lift options, claiming that “The roomy 4-seater gondolas, the elegant double-chairs or the smooth springbox-type T-bars will make every ride, both short or long, comfortable and safe, and the good appearance of Mueller Lifts will make you a proud owner.”  In less than two decades they had come a long way from Mueller’s first rope tow.

In the early 1960s when Franz Wilhelmsen and Eric Beardmore, another Garibaldi Lift Ltd. director, visited Europe to study lift systems prior to choosing the systems to be used at Whistler, many chairlifts still had to be stopped both to load and to unload passengers.  The double chairlift designed by Mueller had patented detachable cable grips that detached the chairgrip from the hauling rope at both stations, allowing the hauling rope to continue to run while the chair was slowed for loading and unloading before being reattached to the hauling rope and launched.  This allowed for the creation of a four-person gondola.

When approached, Mueller confirmed that his designs could be adapted to fit the proposed locations on Whistler Mountain.  For the lower stage from the base at Creekside to Midstation, where warmer spring temperatures and wet weather prompted worries of wet clothing before skiers even reached their first run, Mueller proposed a 65-car four-person gondola carrying approximately 500 passengers per hour for a 13-minute ride.  This was to be followed by a double chairlift of 175 chairs carrying approximately 1200 passengers per hour.

The original Red Chair brought riders up to the Roundhouse from 1965 to 1992.
The original Red Chair brought riders up to the Roundhouse from 1965 to 1992.

In 1965 four Mueller-designed ski lifts were installed on Whistler Mountain: the four-person gondola, the double chairlift that would become known as the Red Chair and two T-bars.  Mueller travelled to Whistler to oversee the construction and testing of the lifts and to conduct training sessions with lift staff.  GLC workers were also sent to Switzerland to be trained on the operation and maintenance of the lifts at the GMD Mueller factory.  Mueller was present for for the official opening of the lifts on January 15, 1966.

chair1.jpg
A seat from the original Red Chair sits in Florence Petersen Park.

Whistler Mountain was equipped exclusively with Mueller lifts for only two years.  In 1967 the Blue Chair was designed and installed by Murray-Latta Machine Co. Ltd., a Vancouver-based company.  The original gondola and Red Chair were retired in 1992, but both can still be found here at the museum, a lasting legacy of the designs of Gerhard Mueller.

One thought on “Gerhard Mueller: Designer of Whistler’s First Lifts”

Leave a Reply